Ever since I hired a company to pour sidewalk on the gated side of my house I've wanted to do the same on the other side of my house. My brother and I started planning out how to go about getting the side yard ready to pour and I decided I wanted to tie in the new concrete in with the existing
patio...which meant taking out some grass and sprinklers. With Wayne working and living up north I with the help of my mom did most of the
digging and initial prep work then I'd send pictures up to Wayne for "approval". On a couple occasions he was able to come into town to help fix issues I ran across, the first of which was a 
sprinkler highway and the next was getting my drainage trench to have enough fall. Finally we were down to the final touches and we got things all framed up on Friday the 25th, wrapped the house in protective plastic and did a bit of a dry run to be sure we were all on the same page so to speak. Then Golden Empire Concrete truck and Chucks pumping service were at my house by about 5:45am Saturday morning ready to pour! My brother and Rodney did most of the standing in cement initial work while the pumper guy handled the hose...mom and I were "on the ready" to hand off tools to the boys and then later we started floating it to knock down the rocks. My biggest job was edging...which was easy on the patio portion but it was quite a challenge as I moved down the side of the house because you only had space for you foot and I wasn't tall enough to reach the wall with my hands like the boys could so I got creative and used by leg! The weather was on our side that morning and the trucks were gone before 7am...we were done working it by around 9:30 or 10! I think it turned out really well, it was a fun project
that I
had a hand in creating and with a lot of sweat equity and some borrowed hands and equipment it was much cheaper this way! Thanks to all those who helped make it happen...I REALLY appreciate it!!!













2 comments:
Wow that turned out really great. I bet your hip was sore after that gymnist move!
Ha! Yeah, I was sore in some strange places but it was the most efficiant position for me (as I wasn't tall enough to reach the wall with my arm). I could work about 3-4 feet at a time before kicking off the wall and repositioning again! :) The boys were crazy sore in their sholders and back from doing it the other way!
Post a Comment